Concrete Slab Calculator

Cubic Yard Calculator

Convert length, width, and depth to cubic yards of concrete, then apply an editable waste allowance. Use the result as a planning quantity and confirm the final order with your ready-mix supplier.

ft
ft
in

Cubic Yards

Order quantity (with waste)
2.72yd³
Net volume (no waste)
2.47yd³
Cubic feet
73.3ft³
Weight
11,000lb · 5.5 tons

1 yd³ = 27 ft³. Most ready-mix suppliers sell in 0.25 or 0.5 yd³ increments — round up the "order quantity" figure to match your supplier's minimum.

What Is a Cubic Yard?

A cubic yard is the volume of a cube measuring 3 feet on every side — 3 ft × 3 ft × 3 ft = 27 cubic feet. Ready-mix concrete is sold by the cubic yard (yd³) across the United States and Canada. One cubic yard converts to:

  • 27 cubic feet (ft³)
  • 0.7646 cubic meters (m³)
  • 201.974 US gallons
  • ~4,050 lb (1,837 kg) of normal-weight concrete
  • ~2 short tons of placed concrete

How to Calculate Cubic Yards of Concrete

Multiply length × width × thickness in consistent units to get cubic feet, then divide by 27 to convert to cubic yards. Multiply the result by (1 + waste fraction) to get the order quantity.

Cubic yards (with waste)
yd³ = (length ft × width ft × thickness in ÷ 12) ÷ 27 × (1 + waste%)

The 10% waste factor covers spillage, uneven sub-grade, and form leakage on a typical residential pour.

Worked example: a 20 ft × 10 ft slab at 4 inches thick equals 20 × 10 × (4 ÷ 12) = 66.67 ft³. Divide by 27: 2.47 cubic yards. Add 10% waste: 2.72 yd³ — order 2.75 yd³.

Cubic Yards Needed by Slab Size

Pre-computed cubic yards for the most common residential slab dimensions, including the calculator's editable 10% starting allowance:

Slab size4″ thick5″ thick6″ thick
10 × 10 ft1.36 yd³1.70 yd³2.04 yd³
12 × 12 ft1.96 yd³2.44 yd³2.93 yd³
15 × 15 ft3.06 yd³3.82 yd³4.58 yd³
20 × 10 ft2.72 yd³3.39 yd³4.07 yd³
20 × 20 ft5.43 yd³6.79 yd³8.15 yd³
24 × 24 ft7.83 yd³9.78 yd³11.74 yd³
30 × 30 ft12.22 yd³15.28 yd³18.33 yd³
40 × 30 ft16.30 yd³20.37 yd³24.44 yd³

See Your Order in the Truck

Slide the cubic-yard input to fill the mixer drum. Trucks needed, short-load fee, and estimated total update live so you can see when your order spans multiple deliveries or hits the short-load threshold.

25% full · 2.50 of 10 yd³
Cubic yards ordered2.50 yd³
0.5 yd³ (post hole)20 yd³ (large slab)

Trucks needed

1

truck

Order weight

10,125

lb

Short-load fee

$60

under 3 yd³

Estimated total

$460

@ $160/yd³

A standard ready-mix truck carries 9–11 cubic yards (6.9–8.4 m³). Smaller orders may trigger a short-load or minimum-order charge. Orders over the single-truck capacity need additional delivery planning. Confirm capacity, minimums, waiting time, and all fees with your supplier.

How Concrete Is Sold by the Yard

Truck capacity, order increments, and minimum quantities vary by supplier and local weight limits. Smaller orders may incur a short-load or minimum-invoice charge, so request the complete delivered total before ordering.

  • Ask the supplier for that truck's legal capacity and whether multiple loads are required.
  • Confirm the available order increment rather than rounding independently.
  • Short load: confirm the supplier's threshold and fee in writing.
  • Minimum order: confirm the minimum quantity or minimum invoice for your delivery address.

Converting Cubic Yards to Other Units

FromToMultiply by
Cubic yards (yd³)Cubic feet (ft³)27
Cubic yards (yd³)Cubic meters (m³)0.7646
Cubic yards (yd³)US gallons201.974
Cubic yards (yd³)Pounds of concrete~4,050
Cubic feet (ft³)Cubic yards (yd³)0.0370
Cubic meters (m³)Cubic yards (yd³)1.308
Square feet × thickness (in)Cubic feet÷ 12
Square feet × thickness (in)Cubic yards÷ 324

The square-feet shortcut: divide total square footage by 81 for a 4-inch slab to get cubic yards directly (a 200 sq ft × 4 in slab = 200 ÷ 81 = 2.47 yd³, which matches the longhand calculation).

Cubic Yard Calculator FAQs

Answers to the most common questions about cubic yards, conversions, and ordering ready-mix concrete.

More Concrete Slab Calculators

Plan slab quantities, ordering and material costs with these focused supporting tools.